Safety stock and service levels for supply chain and operations leaders. The Plimsoll line is the mark on a hull between carrying too little and carrying too much.
Free. No signup. Your figures never leave your browser: Copy link carries them inside the link itself, so they reach no server and go only where you send it. Two things do leave: what you type into the chat bubble, and a file you ask to be emailed after a download.
The holding rate and the order cost are placeholders, not benchmarks. Both vary enormously by industry and nothing here can verify yours. Put your own numbers in before quoting any of this.
=STDEV(range).
It is how much a typical period differs from the average.=STDEV() of the days taken. Leave it blank only if the supplier is
genuinely never early and never late.One part per line:
code | description | unit cost | demand | demand ± | lead time | lead time ±.
This box and the rows above are the same data. Editing either updates the other.
Plimsoll SCM · a CMK Sons Labs operations tool · everything computed in your browser